At Warestar, we not only work directly with the end user, but we also have a close relationship with several general contractors and have assisted them with many of their projects that required material handing equipment.
On this project, Warestar worked closely with a contractor to come up with a solution to enclose several areas at an American Eagle facility in Pennsylvania. Since they would be storing aerosol products in one area, safety was key. Those partitions had to be flush with the floor and the state required a 2″ gap at the ceiling to allow for snow load. We were able to come up with a wire partition solution that would meet their requirements for not only this critical area but for several locations within their warehouse.
Installation for the project was planned out meticulously and was completed without incident and to the customer’s satisfaction.